logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Concrete Technology Sheet 12

  • 1) Question.

    Soundness test of cement by LeChatelier's apparatus gives unsoundness due to

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    Weight of an oven dry sand and air dry sand are 500 gm and 520 gm respectively. If the wieght of the same sand under saturated but surface dry condition of 525 gms, then the water absorption of sand is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    Increase in fineness modulus of aggregate indicates

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    The ordinate of grading curve of an aggregate represents

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    If W1, W2, W3 and W4 are weights of sand in oven dry, air dry, saturated but surface dry and moist conditions respectively, then the moisture content of sand is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    If the angularity number of an aggregate is increased, then the workability of the concrete using this aggregate will

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    Increase in the fineness of cement results in

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    The diameter of needle used in Vicat's apparatus for the determination of initial setting time is prescribed as

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    In counterfort type retaining walls

    i) the vertical slab is designed as a continuous slab

    ii) the heel slab is designed as a continuous slab

    iii) the vertical slab is designed as a cantilever

    iv) the heel slab is designed as a cantilever

    The correct answer is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    Half of the main steel in a simply supported slab is bent up near the support at a distance of x from the center of slab bearing where x is equal to 

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 11) Question.

    For batching 1:2:4 concrete mix by volume, the ingredients required per bag of cement are -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 12) Question.

    When the batching of material is done by weight -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 13) Question.

    Weight batching is done by -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 14) Question.

    The importance of batching is to obtain -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 15) Question.

    The process of proper and accurate measurement of all concrete materials for uniformity of proportions and aggregate grading is called -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 16) Question.

    If the effective plan area of a warehouse is 54 m², and the maximum height of pile permitted is 2.7m, then the number of cement bags to be stored is -

    Answer.

    No. of cement bags stored = (Volume of warehouse/ Volume of cement bag = (54 x 2.7) / (0.3 x 0.18) = 2700 bags

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 17) Question.

    The capacity of a ware-house depends upon the -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 18) Question.

    In designing a ware-house, it is assumed that -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 19) Question.

    To prevent the cement bags from any possible contact with moisture, the main point that should be kept in mind is that the -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 20) Question.

    The term 'ware-house pack' means -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.