logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Estimate and Costing Sheet 1

  • 1) Question.

    Pick up the correct statement from the following:·

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    The floor area includes the area of the balcony up to

    Answer.

    The floor area of a building is the usable covered area measured from the inner faces of the walls.

    For estimation and valuation purposes:

    • Rooms, kitchens, bathrooms, stores, etc. are taken as 100% of their area.
    • Balcony area is generally included up to 50% of its actual area in the floor area calculation.
    • Open terraces are usually not included in the floor area.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    Carpet area does not include the area of

    Answer.

    Carpet Area is the net usable area of a building that can actually be covered by a carpet. In many estimation and valuation objective questions, it excludes:

    • Verandah, corridor and passage
    • Bathroom and lavatory
    • Kitchen and pantry

    Therefore, all the areas mentioned in the options are excluded from the carpet area.

    ✅ Answer: 4. All the above

    Quick Note

    • Carpet Area = Actual usable living area.
    • Floor Area = Carpet Area + area of kitchen, bathroom, pantry, etc.
    • Plinth Area = Covered built-up area measured at floor level, including wall thickness.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    The plinth area of a building not includes

    Answer.

    Plinth Area is the built-up covered area measured at the floor level, including wall thickness.

    It includes:

    • Area of stair cover
    • Lift well and lift landing
    • Internal shafts for sanitary installations (up to about 2 m²)
    • Walls and covered projections

    It does not include:

    • Cantilevered porch
    • Cantilevered balcony
    • Open terraces
    • Architectural projections without floor support

    Therefore,

    ✅ Answer: 4. Area of cantilevered porch

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    Pick up the incorrect statement from the following:·

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    For the consturction of buildings, the subheads of the estimate are

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    Pick up the correct statement from the following:·

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    The main factor to be considered while preparing a detailed estimate, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

    Answer.

    A Revised Estimate is prepared when the expenditure of a work is likely to exceed the amount of the original sanctioned estimate by more than 5%, due to:

    • Increase in rates of materials or labour
    • Change in quantities
    • Alteration in design or specifications

    Therefore, if the cost exceeds the sanctioned estimate by 5% or more, a revised estimate is required.

    ✅ Answer: 4. 5.0%

    Exam Tip

    • Revised Estimate → Excess over sanctioned estimate > 5%
    • Supplementary Estimate → For additional items not included in the original estimate.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    The most reliable estimate is

    Answer.

    A Detailed Estimate is the most reliable estimate because:

    • It is prepared from complete drawings and specifications.
    • Quantities of all items are worked out in detail.
    • Rates are applied item-wise.
    • It gives the most accurate cost of the project.

    Other estimates are approximate:

    • Preliminary Estimate → Rough estimate for administrative approval.
    • Plinth Area Estimate → Based on plinth area rate.
    • Cube Rate Estimate → Based on volume of the building.

    Reliability Order

    1. Detailed Estimate ✅ (Most accurate)
    2. Cube Rate Estimate
    3. Plinth Area Estimate
    4. Preliminary Estimate

    Answer: Option 1 – Detailed Estimate ✅

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.