Estimate and Costing Sheet 3
-
1) Question.
If tensile stress of a steel rod of diameter D is 1400 kg/ and bond stress is 6kg/,the required bond length of the rod is
Answer. -
2) Question.
Referring of Fig.24.1,pick up the correct statement from the following:
Answer. -
3) Question.
In long and short wall method of estimation,the length of long wall is the centre to centre distance between the walls and
Answer.In long wall and short wall method, the wall along the length of the room is considered to be long wall and the wall perpendicular to the length of the room is considered to be short wall.
Long wall length out-to-out = centre to centre length + half breadth on one side + half breadth on the other side
= centre to centre length + one breadthShort wall length in-to-in = centre to centre length – one breadth

-
4) Question.
The centre line method is specially adopted for estimating
Answer.The Centre Line Method is generally adopted for estimating quantities in buildings where:
- The walls are of uniform thickness.
- The plan is symmetrical.
- There are many wall junctions, making long-wall and short-wall calculations tedious.
This method is particularly convenient for:
- Hexagonal buildings
- Octagonal buildings
- Other geometrical (polygonal or curved) shaped buildings
In these structures, measuring the total centre-line length of walls simplifies the estimation of excavation, concrete, brickwork, plastering, etc.
-
5) Question.
Pick up the correct statement regarding the centre line method of estimating a building
Answer. -
6) Question.
While preparing a detailed estimate
Answer. -
7) Question.
Pick up the correct statement from the following:
Answer. -
8) Question.
The weight of an item is measured correct to nearest
Answer.
-
9) Question.
The volume is measured correct to the nearest
Answer. -
10) Question.
The area is measured correct to the nearest
Answer.