logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Estimate and Costing Sheet 3

  • 1) Question.

    If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6kg/cm2,the required bond length of the rod is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    Referring of Fig.24.1,pick up the correct statement from the following:·

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    In long and short wall method of estimation,the length of long wall is the centre to centre distance between the walls and

    Answer.

    In long wall and short wall method, the wall along the length of the room is considered to be long wall and the wall perpendicular to the length of the room is considered to be short wall.

    Long wall length out-to-out = centre to centre length + half breadth on one side + half breadth on the other side
    = centre to centre length + one breadth

    Short wall length in-to-in = centre to centre length – one breadth

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    The centre line method is specially adopted for estimating

    Answer.

    The Centre Line Method is generally adopted for estimating quantities in buildings where:

    • The walls are of uniform thickness.
    • The plan is symmetrical.
    • There are many wall junctions, making long-wall and short-wall calculations tedious.

    This method is particularly convenient for:

    • Hexagonal buildings
    • Octagonal buildings
    • Other geometrical (polygonal or curved) shaped buildings

    In these structures, measuring the total centre-line length of walls simplifies the estimation of excavation, concrete, brickwork, plastering, etc.

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    Pick up the correct statement regarding the centre line method of estimating a building

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    While preparing a detailed estimate

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    Pick up the correct statement from the following:·

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    The weight of an item is measured correct to nearest

    Answer.

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    The volume is measured correct to the nearest

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    The area is measured correct to the nearest

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.