logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Highway Sheet 17

  • 1) Question.

    The minimum value of camber provided for thin bituminous surface hill roads, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    The usual width of side drains along Highways in hilly region, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    The usual width of parpet walls along Highways in hilly region, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    According to IRC:52-1973, for a single lane National Highway in hilly region,

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    The wideth of the right of way, is influenced by

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    An upgrade g1% is followed by a downgrade g2%. The equation of the parabolic curve of lenght L to be introduced, is given by

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    The maximum distance of the apex of a vertical curve of length L from the point of intersection of two grades +g1%, and -g2%(g1>g2), is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    In an ideal transition curve, the radius of curvature

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    An ideal vertical curve is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    The radius of curvature provided along a transtion curve, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 11) Question.

    In the Group Index method of flexible pavement design, which one of the following factors decides the thickness of base and surface course ?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 12) Question.

    While designing the superelevation of a highway, its maximum value is fixed considering the need to -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 13) Question.

    While aligning a hill road with a ruling gradient of 1 in 20, a horizontal curve of radius 80 m is encountered. The compensated gradient on the curve will be -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 14) Question.

    Which one of the following is associated with "Limiting Gradient" on highways ?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 15) Question.

    In which one of the following types of bituminous constructions is proportioning of materials determined from laboratory tests ?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 16) Question.

    For sandy soils the most common method of stabilization is -

    Answer.
    Sandy soils are generally stabilized with cement.
     
    The amount of cement required to stabilize depends upon the quantity and quality of fines contained in sandy soils and final compacted density.
     
    The cement required for sandy soils range between 5 and 12% by weight.
     
    Stabilization of soil with cements consists of adding cement to pulverized soil and permitting the mixture to harden by hydration of cement.
     
    The quantity of cement required for stabilization increases as soil plasticity increases.
     
    Note:
     
    Soil-lime stabilization: It is the process of adding lime to the soil to improve its properties like density, bearing capacity etc. The principle involved in lime-soil stabilization is the exchange of ions between lime and soil when added.
     
    When clayey soil is treated with lime, cation exchange takes place between them which increases plastic limit and reduces plasticity index which finally results in increase in stability of soil. This method is used mostly for clayey flocculated soil.
     
    Soil-bitumen stabilization: It is applied to highways and airfield construction. It is the method of designing and mixing local soil or aggregates with bituminous materials to form a stable and waterproof base course.
     
    Bitumen stabilization is used for:-
     
    a) For binding soil particles together for purpose of supplying cohesion for non-mechanical stabilized granular material.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 17) Question.

    Select the incorrect statement ?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 18) Question.

    In hill roadds the side drains are provided -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 19) Question.

    The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 20) Question.

    In highway construction on superelevated curves, the rolling shall proceed from

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.